11949 K3V112DTP YIDAR 9N00 Excavator Hydraulic Pumps For SG200A3 Piston Pump Main Pump

Place of Origin KOREA
Brand Name HANDOK
Model Number K3V112DTP-YIDAR-9N00
Minimum Order Quantity 1PC
Packaging Details Wooden box
Delivery Time 1-7 Days for stock items, 10-25 days for production order
Payment Terms T/T, Western Union
Supply Ability 100 pcs each month

Contact me for free samples and coupons.

Whatsapp:0086 18588475571

Wechat: 0086 18588475571

Skype: sales10@aixton.com

If you have any concern, we provide 24-hour online help.

x
Product Details
MACHINERY SH200A3 PART NO 11949
NAME HYDRAULIC PUMP SIZE INTERNATIONAL STANDARD
MATERIAL IRON PACKING WOODEN BOX
High Light

9N00 Excavator Hydraulic Pumps

,

K3V112DTP Excavator Hydraulic Pumps

,

SG200A3 Piston Pump

Leave a Message
Product Description

11949 K3V112DTP YIDAR 9N00 Excavator Hydraulic Pumps for SG200A3 Piston pump Main pump

 

Product Name:
Main Pump K3V112DTP
Machine Model:
K3V112DTP YIDAR 9N00
Brand:
HANDOK
Condition
OEM& Oringal
Warranty:
12 Months
Production Capacity:
10000 Pcs/Month
Payment Term:
T/T, Western Union
Packing Size:
60*70*69 Wooden case
Means of Transport:
By sea,Air,Or DHL/FEDEX/TNT/EMS
MOQ:
1 PCS
Delivery Time:
2 Day after payment
Total Weight:
238kg
Condition:
New Genuine
Material
Forged Steel
Advantage
In stock

 

Specifiion                  
SPEC NAME Unit AP2D28 K3V63DT K3V112S K3V112DT K3V112DTP K3V140DT K5V140DTP  
Displacement cm³ 27.5*2+16.2+4.5 63×2 112 112×2 112×2 140×2 140×2  
Pressure Rated Mpa 22.4 34.3 34.3 34.3 34.3 34.3 34.3
Pesk Mpa   39.2 39.2 39.2 39.2 39.2 39.2  
Max Speed For Self Priming rpm 2200 2650 2360 2360 2360 2150 2160  
Max Input Torque Of Pump N.m 144 343 588 588 588 1120 843  
Max Input Torque Of Attached Gear Pump With PTO N.m         125   125  
Mass Kg 33 81 68 134 148 160 143  
Applicable Weight ton     -- 20-25 29-37 30-35    
                   
                   
KOMATSU PC30 PC40 PC45 PC60 PC75 PC100 PC120 PC200  
EXCAVATOR PC220 PC300 PC350 PC400          
                   
E70B E110 E120 E200B E307 E311 E312 E320  
EXCAVATOR E322 E325 E300B E330          
                   
KOMATSU D20 D21 D30 D31 D37 D40 D50 D60  
BULLDOZER D63 D65 D80 D85 D135 D155 D355 D375  
D3C D3D D4 D4C D4D D4E D5 D5H  
BULLDOZER D6 D6C D6D D6H D7E D7G D8N D9N  
HITACHI EX30 EX40 EX60 EX100 EX120 EX200 EX220 EX300  
                   
  EX400 ZAX200 ZX330 ZX350 UH07 UH081 UH083    
                   
DAEWOO DH55 DH200 DH220 DH280 DH300 DH320      
                   
                   
HYUNDAI R55 R110 R130 R150 R200 R210 R250 R290  
KEBELCO SK60 SK100 SK120 SK200 SK220 SK300 K904 K907  
MITSUBISHI MS110 MS120 MS140 MS180          
                   
KATO HD140 HD250 HD400 HD550 HD700 HD850 HD900 HD1220  
SAMSUNG H.I. MX8 SE200 SE210 SE280 MX292 SE350      
                   
SUMITOMO SH70 SH100 SH120 SH160 SH200 SH280 SH300 SH340  

 

 

 

Please contact us if you do not find what you are looking for on this website, we have a great product egory.

 

11949 K3V112DTP YIDAR 9N00 Excavator Hydraulic Pumps For SG200A3 Piston Pump Main Pump 0

 

 

FAQ

 

 

Q. Which countries have you exported?

ASIA: Iraq, UAE, Turkey, Thailand, Malaysia, Indonesia, Vietnam, Bangladesh, Kuwait, Lebanon

EUROPE: Russia, Kazakhstan, Greece, Norway, Ireland

OCEANIA: Australia, Fiji, Kiribati, New Caledonia

AMERICAS: Canada, Jamaica, Brazil, Peru, Chile,

AFRICA: Angola, South Africa, Kenya, Tanzania, Zambia, Sudan, South Sudan, Egypt, Algeri, Nigeria

 

Q: How can I get a quotation?
A: A complete quotation based on the details as follows in your inquiry:
1. Part No. 2.Engine model 3.Machinery model 4. Description and size

Picture. 6.. Quantity 6. Other requirements, such as Packing, Shipping and so on.

 

Q: 4. When can you deliver after sending deposit?
It depends on your order quantity, if we have stock then need about 3~10 working days get it ready, if no stock we will start to produce when the deposite received. Usually it takes 15-60 days for different items.


Q: How do you pack the goods?
We have 20 years experience on export, finished products will be carefully handled by three steps:
1: Wrapped with packing paper or plastic bag;
2: HKT / FUP box or neutral box;
3: Put in an appropriate carton box or wooden boxes and be fixed firmly.

 

Q: How can I know the status of my order?
We will keep you udpate the process of the preparation, to ensure all issues are resolved prior to the delivery.products pictures can be provided if required. We shall send out the goods immediately after confirmation and you will get the tracking information right away

 

Q: How to guarantee your service?

A. Strict inspection during production

B. Strictly check the products before shipment to ensure our packaging in good condition

C. Track and receive feedback from customer regularly

 

Q: What will you do for quality complaint ?

A. We will respond to customer within 24 hours.

B. Our QC will retest the same stock item, if confirmed it is quality problem, we will make corresponding compensation